I feel very happy to be able to work and I'm getting the spirit to work because my job always can serve as an example for other co-workers colleagues. By this I admire and pursue work that has been entrusted to me.
According to the data I got from the production to the maximum capacity of the machine can not logically, because the normal capacity of the engine is 5000 pcs per day according to the normal hours 7 hours. In fact we always work more than seven hours and even up to 10 or 12 hours of work, for that I will show you a more precise calculation in accordance with our working hours.
If within 1 hour capacity of the machine can be 700 pcs then if we work 10 hours per day output should be 700 pcs (without any problem / current). From these calculations I will show how much the output in a month and how much profit us if we could optimize the capacity of the machine.
Cycle and output calculations per day along with a benefit that I wrote in the appendix of this letter. Thanks and successful greeting.
Sincerely,
Hans
appointment letters samples
appointment letters samples
Mr Hans
Direktur Sumber Daya Manusia
Ardha Ardhi
4535 Riverside Drive
Pringapus 50553
23 Agustus 2014
Ibu Santi
1234 dangwaru Jalan
Kemasan,
Dear Ms Shanti,
I feel very happy to be able to work and I'm getting the spirit to work because my job always can serve as an example for other co-workers colleagues. By this I admire and pursue work that has been entrusted to me.
According to the data I got from the production to the maximum capacity of the machine can not logically, because the normal capacity of the engine is 5000 pcs per day according to the normal hours 7 hours. In fact we always work more than seven hours and even up to 10 or 12 hours of work, for that I will show you a more precise calculation in accordance with our working hours.
If within 1 hour capacity of the machine can be 700 pcs then if we work 10 hours per day output should be 700 pcs (without any problem / current). From these calculations I will show how much the output in a month and how much profit us if we could optimize the capacity of the machine.
Cycle and output calculations per day along with a benefit that I wrote in the appendix of this letter. Thanks and successful greeting.